Commuter train on a service track inside a rail maintenance depot

Scrap recovery for rail operators and track renewals.

Where we work
Track renewal worksites and maintenance depots
How we fit in
Bins and transport planned to possession windows and depot schedules
Scheduling
Work planned to possessions, depot shutdowns and fleet retirement programmes.

Overview

Track renewals and fleet replacement produce heavy, well-defined scrap in planned windows. Rail, sleeper fastenings, wheelsets and whole vehicles have to be removed within possessions or depot schedules that leave little room to spare.

Rail, wheels, axles and retired rolling stock from depots and track renewals, recovered to possession and depot schedules.

We work to your possession and depot schedules, staging bins and transport where your track and depot teams agree, and clearing material before the window closes.

Rail and wheelsets are cut to transport size and graded as heavy steel. Overhead line copper is recovered and recorded separately.

For retired rolling stock, we dismantle in an agreed area, recover the non-ferrous content and keep each vehicle traceable through the records.

Typical scrap streams on site

What we usually recover in this sector, where it comes from and how it is handled.

  • Ferrous

    Rail and track components

    From:
    Track renewals, turnouts and fastenings
    Handling:
    Cut to transport length and graded as heavy steel
  • Ferrous

    Wheels, axles and bogies

    From:
    Wheelset replacement and bogie overhauls at depots
    Handling:
    Collected from depot stores on schedule and graded separately
  • Mixed

    Retired rolling stock

    From:
    Vehicles withdrawn at the end of their service life
    Handling:
    Dismantled in an agreed area, with copper, aluminium and steel recovered separately
  • Mixed

    Overhead line copper and steel structures

    From:
    Overhead line renewals and mast replacement
    Handling:
    Contact wire graded as copper, masts and portals as steel

Working to possession and depot schedules

A possession has a fixed end time. Our bins, crews and transport are planned so material is cleared before the line is handed back.

  1. Possession planning

    Collection points and transport agreed with your track team before the possession starts.

  2. Your safety rules

    Crews work under your track access and depot rules, with briefings each shift.

  3. Heavy cutting and lifting

    Rail and vehicle sections cut and lifted to an approved plan.

  4. Traceable vehicles

    Each retired vehicle recorded from depot to yard to mill.

What we keep separate

Material that is not scrap, or that loses value when mixed, never goes into a scrap load.

  • Treated timber sleepers

    Sleepers and timber are not scrap metal and stay out of steel loads.

  • Oils, batteries and hazardous fittings

    Lubricants, batteries and other scheduled waste from vehicles are handled by licensed contractors.

  • Copper from overhead lines

    Kept separate from steel so contact wire is graded and accounted for as copper.

How it is documented

Records your procurement, HSE and audit teams can file.

  • Weighbridge ticket for every load
  • Records by possession, depot or vehicle
  • Delivery orders and transport records
  • Certificates of disposal for retired rolling stock
Chain of custody and reporting
Diesel locomotive with headlights on crossing open land at twilight, beside a pylon

Planning a track renewal or fleet retirement?

Share the possession plan or retirement schedule, and we will propose a recovery plan around it.