Scrap recovery for construction and demolition sites.
- Where we work
- Building sites, demolition projects and contractor yards
- How we fit in
- Bins placed and swapped to your programme, with rebar, sections and non-ferrous kept apart
- Scheduling
- Bins placed and swapped to your construction programme, with extra collections during strip-out and demolition.
Overview
Construction and demolition sites produce mixed steel that has to leave on programme. Rebar offcuts, sections, formwork and building services metal pile up quickly where space is tight.
Rebar, structural steel and formwork from building sites and demolition, collected to your programme and sorted so the value is kept.
We place bins where your site team wants them, collect to your programme and work around crane lifts, pours and deliveries.
On demolition jobs, we recover structural steel and building services metal as the structure comes down, with rebar, sections and non-ferrous metal kept apart.
Mixed loads lose value. Separating rebar from sections, and copper and aluminium from steel, keeps the return on your scrap where it should be.
Typical scrap streams on site
What we usually recover in this sector, where it comes from and how it is handled.
- Ferrous
Reinforcing bar
- From:
- Offcuts from cutting and bending, and bar recovered from demolition
- Handling:
- Collected in dedicated bins and graded separately from sections
- Ferrous
Structural steel sections and plate
- From:
- Steel frames, beams, columns and plate from demolition and modification
- Handling:
- Cut to mill length and graded as heavy steel
- Ferrous
Steel formwork and scaffolding
- From:
- Damaged or retired formwork panels, props and scaffold tube
- Handling:
- Collected in bulk and recorded by load
- Non-ferrous
Cable, pipe and building services metal
- From:
- Strip-out of electrical, plumbing and mechanical services
- Handling:
- Copper, brass and aluminium separated from steel and graded on their own
Collected on your programme
Sites change week by week. Bin positions and collection days move with your programme so scrap never gets in the way.
Planned around the programme
Collections scheduled around pours, lifts and deliveries.
Site rules followed
Drivers inducted, PPE to your standard and traffic routes agreed with your team.
Sorted to keep value
Rebar, sections and non-ferrous metal kept apart so nothing is downgraded.
Records for the project file
Tickets and statements your site and commercial teams can file.
What we keep separate
Material that is not scrap, or that loses value when mixed, never goes into a scrap load.
Asbestos-containing material
We collect steel only once any asbestos-containing material has been removed by a licensed contractor.
Concrete, timber and general waste
Non-metal debris stays with your waste contractor and is kept out of scrap bins.
Non-ferrous metal
Copper, brass and aluminium from services strip-out are kept apart from steel.
How it is documented
Records your procurement, HSE and audit teams can file.
- Weighbridge ticket for every load
- Monthly tonnage and value statement by project
- Delivery orders and transport records
- Figures your sustainability team can use for recycling reporting
Services for this sector
Each service can be contracted on its own or as part of one programme.
Related materials
The grades this sector most often produces. Our materials page lists every stream we recover.
All materialsOther sectors in this group
Ports, rail, construction, data centres and airports, where scrap has to move without disrupting operations.
- Infrastructure
Ports and marine
Supply bases, terminals and shipyards. Mooring chain, wire rope, retired equipment.
- Infrastructure
Rail
Rail, wheels, axles and retired rolling stock from depots and track renewals.
- Infrastructure
Data centres and telecoms
Racks, cable, cooling plant and towers from data halls and telecom networks.
- Infrastructure
Airports and aviation
Ground support equipment, structures and refit metal from airports and hangars.

Appointing a scrap contractor for a demolition or a large build?
Tell us about the programme and the site, and we will propose bins and collections around it.