Where we work
Process units in turnaround, workshops and laydown yards
How we fit in
Bins and crews mobilised to your shutdown plan, with alloys separated at the work front
Scheduling
Mobilised to your turnaround programme, with routine collections between shutdowns.

Overview

Turnarounds and shutdowns produce large volumes of scrap in short windows. Piping, valves, exchanger bundles and vessel internals come out fast, and laydown space is always limited.

Turnaround and shutdown scrap, piping, valves and exchanger bundles, cleared to your schedule with stainless and alloys kept apart.

We mobilise bins and crews to your turnaround schedule, agree laydown and loading points with your shutdown team, and clear material as it is released so it does not block the work front.

Carbon steel, stainless steel and high-value alloys are separated at source. Mixed bins are where alloy value is lost, so we plan segregation before the first flange is broken.

Between turnarounds, we run scheduled collections for maintenance scrap from workshops, stores and laydown yards.

Typical scrap streams on site

What we usually recover in this sector, where it comes from and how it is handled.

  • Ferrous alloy

    Carbon and stainless steel piping

    From:
    Process and utility lines replaced during turnarounds
    Handling:
    Segregated by material at the work front and graded separately at our yard
  • Ferrous alloy

    Heat exchanger bundles

    From:
    Retubed or replaced exchangers
    Handling:
    Released only once cleaned and certified by your team, then graded by tube material
  • Mixed

    Valves, flanges and fittings

    From:
    Valve change-outs and piping modifications
    Handling:
    Sorted into carbon steel, stainless and non-ferrous so each is valued on its own grade
  • Non-ferrous

    Cable and electrical scrap

    From:
    Electrical upgrades, motor replacements and instrument work
    Handling:
    Graded by conductor for stripping or granulation

Built around the turnaround schedule

A shutdown runs to the hour. We plan bins, crews and haulage before the first day so scrap never holds up the work front.

  1. Shutdown planning

    Bin positions, laydown and loading points agreed with your shutdown team in advance.

  2. Released items only

    Equipment is collected only after your team confirms it is drained, cleaned and released.

  3. Clearing as work progresses

    Bins swapped through each shift so material does not build up at the work front.

  4. Crews to your standard

    Inductions, gas testing and PPE to your plant rules, every shift.

What we keep separate

Material that is not scrap, or that loses value when mixed, never goes into a scrap load.

  • Stainless steel and nickel alloys

    Kept out of carbon steel bins from the start, so alloy content is graded and valued as its own grade.

  • Contaminated equipment

    Items with process residue, catalyst or insulation are not collected as scrap until your team has cleaned and released them.

  • Scheduled waste

    Spent catalyst, sludge, oily waste and insulation are handled by licensed contractors, never mixed with scrap.

How it is documented

Records your procurement, HSE and audit teams can file.

  • Weighbridge ticket for every load
  • Turnaround close-out statement by grade and weight
  • Delivery orders and transport records
  • Certificates of disposal on request
Chain of custody and reporting
Chemical plant with a tall stack and drifting steam, lit up at night

Appointing a contractor for turnaround scrap?

Send us the dates and scope, and we will propose bins, crews and segregation around them.